89 Link Road — Upstairs

Josh & Jayden — phase-by-phase to-do
0% complete — of 6 phases done

Every Coat — Without Fail

How this works Tick each task as you go. Your progress is saved automatically on this phone — close the page or come back tomorrow, it'll all still be here. Yellow boxes are Sam's Checks — don't skip them. Green button at the bottom of each room signs the room off.

1Box Bedroom — Finish Off

Closest to done. Get this signed off first.
JaydenSand fine filler with a sanding pad — light touch, no scratch marks, no going through the topcoat
JaydenWipe walls down, hoover all dust off the floor and skirting tops
JaydenSpot prime every filled patch — give it proper drying time before recoating
⚠ Sam's Check — Prep
Walk the room with a torch held flat to the wall (raking light). Every filled spot should be primed and the same sheen as the surrounding wall. No bare patches. No missed bits round the corners.
JoshCheck all caulk lines — wall-to-skirting, wall-to-architrave, wall-to-ceiling. Any drops or cracks → re-caulk and let it cure fully before painting
JoshCut in walls — final coat
Josh / JaydenRoll walls — final coat. Keep a wet edge, don't let bits dry mid-wall
⚠ Sam's Check — Walls Final
Stand back, raking light across each wall. No holidays, no roller marks, no flashing where the cut-in meets the roller. Edges crisp against ceiling and woodwork.
JoshLightly sand skirting boards (denib only — knock the nibs off, don't strip the first coat back). Wipe down with a tack cloth
JoshFinal coat satinwood on skirting — long, smooth strokes, lay off in one direction
⚠ Sam's Check — Skirting Final
Glass-smooth feel. No brush marks visible from sitting height. No runs or sags at the bottom. Clean line at the top against the wall.
— Move to Master so the ceiling can dry —

2Master Bedroom — Ceiling Only

Knock this out, then crack on with Tom's while it dries
— Now do Tom's full while master ceiling sets —

3Tom's Bedroom — Full Walls + Woodwork

Lights first, feature wall last. Ceiling sign-off before any walls.
— Back to Master for walls + woodwork —

4Master Bedroom — Walls + Woodwork

Resume now ceiling is dry. Doors need full prep.
— Quick one in the bathroom —

5Bathroom — Ceiling Only

Just the ceiling. No walls, no woodwork.
— Last one: landing & stairs (full works) —

6Landing & Stairs — Full Works

Ceilings sign-off before any walls. Full woodwork incl. banister.

Handover

Final walk-around before you leave for good